Heat Treatment of Metals ›› 2022, Vol. 47 ›› Issue (2): 262-266.DOI: 10.13251/j.issn.0254-6051.2022.02.046

• FAILURE ANALYSIS • Previous Articles    

Failure analysis of 20 steel equal-diameter tee

Li Dejun1,2, Gao Hua3, Kong Xianglu3, Yang Xiaoping3, Li Ta3, Dong Zhaoyuan3, Zhang Xiaojia1,2   

  1. 1. CNPC Tubular Goods Research Institute, Xi'an Shaanxi 710077, China;
    2. State Key Laboratory of Performance and Structural Safety for Petroleum Tubular Goods and Equipment Materials, Xi'an Shaanxi 710077, China;
    3. Petrochina Coalbed Methane Company Limited, Beijing 100028, China
  • Received:2021-10-15 Revised:2021-12-28 Online:2022-02-25 Published:2022-04-01

Abstract: Failure causes of failed 20 steel equal-diameter tee used in a metering skid were investigated through the fracture analysis, chemical composition analysis, microstructure analysis, Brinell hardness and electrochemical corrosion test combining with the manufacture process of the tee. The results show that the tee made of 20 steel seamless pipe by hydraulic cold expansion forming process does not meet the standard requirements of normalizing or annealing treatment. The embrittlement caused by work hardening is not eliminated, which leads to the reduction of defect tolerance of the tee, and then the brittle fracture. Moreover, the electrochemical corrosion properties of the failed tee decline clearly due to the cold deformation, and the corrosion of inner wall of the tee is aggravated, and then the corrosion pit on inner wall of the tee becomes the crack source of brittle fracture. It is recommended to enhance the quality supervision and ex-factory inspection of the tee.

Key words: 20 steel equal-diameter tee, brittle fracture, corrosion resistance

CLC Number: